Photos of St. Paul Construction Project
for Buildout and Handicap Access

It is time to celebrate and thank God for his blessings!!
The project is essentially complete!!!
(Occasional pictures may be posted to cover any final changes or additions.)

[Click on Thumbnail Image to View a larger Picture]

[Note:  These pictures are at the screen size of 1016x762 resolution.  For older browsers: Please make free use of the browser's scroll bars to view all parts of the larger pictures so nothing is missed, if necessary.  Also, the "Fullscreen" option can be used, if your browser supports it, to view more of the picture with minimal scrolling.  For newer browsers and operating systems: They usually have automatic scaling of images, with special icons to allow selection of the size to view, thereby negating the need for the above operations.  When viewing the picture, use the browser's "back" button to return to this page.] 

These pictures show the very beginning of the project; ground has been broken, some equipment is present, and the area is fenced off.

  StPaulBuildout_Handicap_Const_1.jpg (195050 bytes)    StPaulBuildout_Handicap_Const_2.jpg (179266 bytes)    StPaulBuildout_Handicap_Const_3.jpg (202437 bytes)    StPaulBuildout_Handicap_Const_4.jpg (155383 bytes)    StPaulBuildout_Handicap_Const_5.jpg (162408 bytes)

 

The following pictures show work in progress on 5/2/06.

StPaulBuildout_Handicap_Const_6.jpg (168427 bytes)    StPaulBuildout_Handicap_Const_7.jpg (158035 bytes)    StPaulBuildout_Handicap_Const_8.jpg (271195 bytes)

 

The following pictures show work in progress on 5/3/06.

StPaulBuildout_Handicap_Const_9.jpg (203265 bytes)    StPaulBuildout_Handicap_Const_10.jpg (253130 bytes)    StPaulBuildout_Handicap_Const_11.jpg (265993 bytes)    StPaulBuildout_Handicap_Const_12.jpg (211403 bytes)

 

The following pictures show work in progress on 5/4/06.

StPaulBuildout_Handicap_Const_13.jpg (178786 bytes)    StPaulBuildout_Handicap_Const_14.jpg (216455 bytes)    StPaulBuildout_Handicap_Const_15.jpg (212332 bytes)

 

The following pictures show work in progress on 5/23/06.

StPaulBuildout_Handicap_Const_16.jpg (221552 bytes)    StPaulBuildout_Handicap_Const_17.jpg (222278 bytes)

 

The following pictures show work in progress on 5/24/06.

StPaulBuildout_Handicap_Const_18.jpg (221595 bytes)    StPaulBuildout_Handicap_Const_19.jpg (170225 bytes)    StPaulBuildout_Handicap_Const_20.jpg (228812 bytes)

StPaulBuildout_Handicap_Const_21.jpg (147081 bytes)    StPaulBuildout_Handicap_Const_22.jpg (784621 bytes)    StPaulBuildout_Handicap_Const_23.jpg (232242 bytes)

 

The following pictures show work status on 6/5/06.
The walls are coming up !!!

StPaulBuildout_Handicap_Const_24.jpg (249237 bytes)    StPaulBuildout_Handicap_Const_25.jpg (218193 bytes)    StPaulBuildout_Handicap_Const_26.jpg (175872 bytes)    StPaulBuildout_Handicap_Const_27.jpg (245627 bytes)

 

The following pictures show work status on 6/10/06.
We are getting closer !!!

StPaulBuildout_Handicap_Const_28.jpg (147157 bytes)    StPaulBuildout_Handicap_Const_29.jpg (172807 bytes)    StPaulBuildout_Handicap_Const_30.jpg (230353 bytes)    StPaulBuildout_Handicap_Const_31.jpg (220249 bytes)    StPaulBuildout_Handicap_Const_32.jpg (211975 bytes)

 

The following pictures show work status on 7/21/06.
The "Breezeway" roof has been removed;
the new roof sections for the buildout have
arrived, and will soon be installed !!

StPaulBuildout_Handicap_Const_33.jpg (132568 bytes)    StPaulBuildout_Handicap_Const_34.jpg (156269 bytes)    StPaulBuildout_Handicap_Const_35.jpg (149863 bytes)    StPaulBuildout_Handicap_Const_36.jpg (181258 bytes)    StPaulBuildout_Handicap_Const_37.jpg (127054 bytes)

 

The following pictures show work status on 7/27/06.
The new roof over the old "Breezeway" area is now in place !!

StPaulBuildout_Handicap_Const_38.jpg (144766 bytes)    StPaulBuildout_Handicap_Const_39.jpg (148855 bytes)    StPaulBuildout_Handicap_Const_40.jpg (165971 bytes)    StPaulBuildout_Handicap_Const_41.jpg (180231 bytes)

StPaulBuildout_Handicap_Const_42.jpg (135966 bytes)    StPaulBuildout_Handicap_Const_43.jpg (160743 bytes)    StPaulBuildout_Handicap_Const_44.jpg (153810 bytes)    StPaulBuildout_Handicap_Const_45.jpg (161968 bytes)

 

The following pictures show work status on 8/3/06.
The work is moving along !!  The roof "gable" end
has been closed off; exterior brick is being applied
in the front section, and also work is starting on the
handicap access (elevator) area as shown by photos
of the interior !!

StPaulBuildout_Handicap_Const_46.jpg (136412 bytes)    StPaulBuildout_Handicap_Const_47.jpg (158103 bytes)    StPaulBuildout_Handicap_Const_50.jpg (267249 bytes)    StPaulBuildout_Handicap_Const_48.jpg (99827 bytes)

StPaulBuildout_Handicap_Const_49.jpg (127048 bytes)    StPaulBuildout_Handicap_Const_51.jpg (125664 bytes)    StPaulBuildout_Handicap_Const_52.jpg (149540 bytes)

 

The following pictures show work status on 8/8/06.
The work is continuing at a good pace !!  More exterior brick is being
applied in the front section, roof sections are being installed, and one
can see one of the arched door frames in place.  A close up view of the
growing landscape addition(not really)* is also shown.

[* The luxuriant growth of vegetation on the excavated dirt pile.]

StPaulBuildout_Handicap_Const_53.jpg (257237 bytes)    StPaulBuildout_Handicap_Const_54.jpg (216769 bytes)    StPaulBuildout_Handicap_Const_56.jpg (211822 bytes)    StPaulBuildout_Handicap_Const_55.jpg (202559 bytes)

 

The following pictures show work status on 8/13/06.
Shown are views of a pillar by the new back entrance, as well as the new arched entrance itself.  Also shown is an interior view showing the front entrance to the buildout and the newly cut entrance to the sanctuary (boarded off).  Another view shows the expanse of the new section looking toward the rear handicap access area and showing the finished flat roof section, as well as some ductwork.  The final view is of the church sanctuary interior showing the new doorway (boarded off) to the buildout (note the two pews that have been removed for access).

StPaulBuildout_Handicap_Const_57.jpg (194225 bytes)    StPaulBuildout_Handicap_Const_58.jpg (187946 bytes)    StPaulBuildout_Handicap_Const_59.jpg (124752 bytes)    StPaulBuildout_Handicap_Const_60.jpg (145972 bytes)    StPaulBuildout_Handicap_Const_61.jpg (124026 bytes)

 

The following pictures show work status on 8/17/06.
Shown are views of an almost completed exterior of the front section to the buildout with the new front entrance prominantly observable.  Also shown are the beginnings of the handicap access (ramp) for the front entrance.

StPaulBuildout_Handicap_Const_62.jpg (264825 bytes)    StPaulBuildout_Handicap_Const_63.jpg (215749 bytes)    StPaulBuildout_Handicap_Const_64.jpg (197941 bytes)    StPaulBuildout_Handicap_Const_65.jpg (246157 bytes)

 

The following pictures show work status on 8/23/06.
Shown are views of some of the windows that have been installed in both the front and
back sections of the buildout.  Other views show extensive interior work, including
studding for the wall partitions, ductwork, and drainpiping for the flat roof section.
The new entrance is really beginning to take shape !!

StPaulBuildout_Handicap_Const_66.jpg (204676 bytes)    StPaulBuildout_Handicap_Const_67.jpg (191863 bytes)    StPaulBuildout_Handicap_Const_68.jpg (207723 bytes)    StPaulBuildout_Handicap_Const_69.jpg (143991 bytes)    StPaulBuildout_Handicap_Const_70.jpg (168196 bytes)

StPaulBuildout_Handicap_Const_71.jpg (168366 bytes)    StPaulBuildout_Handicap_Const_72.jpg (174381 bytes)    StPaulBuildout_Handicap_Const_73.jpg (156866 bytes)    StPaulBuildout_Handicap_Const_74.jpg (200751 bytes)    StPaulBuildout_Handicap_Const_75.jpg (205900 bytes)

 

The following pictures show work status on 8/30/06.
Note the soffit/fascia construction on both the back and front sections of the buildout.
Also shown is the fresh concrete surface on the landing for one of the lifts and some of
the electric wiring in the interior of the front section of the buildout.
Things are really coming along !!

StPaulBuildout_Handicap_Const_76.jpg (160546 bytes)    StPaulBuildout_Handicap_Const_77.jpg (190920 bytes)    StPaulBuildout_Handicap_Const_78.jpg (188936 bytes)    StPaulBuildout_Handicap_Const_79.jpg (149658 bytes)    StPaulBuildout_Handicap_Const_80.jpg (179853 bytes)

 

The following pictures show work status on 9/8/06.
Shown are the new front sidewalks to the front entrance.  Also shown is a closeup of
the completed front steps and front handicap access ramp.  Another picture shows
work in progress on the roof of the buildout (parking lot side).
We're getting closer all the time !!

StPaulBuildout_Handicap_Const_81.jpg (209225 bytes)    StPaulBuildout_Handicap_Const_82.jpg (179101 bytes)    StPaulBuildout_Handicap_Const_83.jpg (228991 bytes)    StPaulBuildout_Handicap_Const_84.jpg (223544 bytes)    StPaulBuildout_Handicap_Const_85.jpg (151447 bytes)

 

The following pictures show work status on 9/16/06.
Shown is the completed buildout roof section both in the back and front.  Also shown is the front window which is still being worked on.  Additionally is shown an interior view showing insulation on the ductwork.  Lastly, interior views show the steps which will surround the new lower handicap lift.

StPaulBuildout_Handicap_Const_86.jpg (144379 bytes)    StPaulBuildout_Handicap_Const_87.jpg (159609 bytes)    StPaulBuildout_Handicap_Const_88.jpg (169415 bytes)    StPaulBuildout_Handicap_Const_89.jpg (124952 bytes)

StPaulBuildout_Handicap_Const_91.jpg (137663 bytes)    StPaulBuildout_Handicap_Const_90.jpg (129308 bytes)    StPaulBuildout_Handicap_Const_92.jpg (118601 bytes)    StPaulBuildout_Handicap_Const_93.jpg (123878 bytes)

 

The following pictures show work status on 9/27/06.
The formerly growing landscape referred to above (the excavated mound of earth
covered with luxuriant vegetation) is finally being removed.  Some landscaping
is beginning.

StPaulBuildout_Handicap_Const_94.jpg (235415 bytes)    StPaulBuildout_Handicap_Const_95.jpg (273635 bytes)    StPaulBuildout_Handicap_Const_96.jpg (281120 bytes)    StPaulBuildout_Handicap_Const_97.jpg (186600 bytes)

 

The following pictures show work status on 10/06/06.
An additional wall has been built by the location of the upper lift.  Also, the stairway
frameworks surrounding the lower lift location have been filled in with concrete.   Lastly,
the famous hill outside is completely gone; the leveling has been completed.

StPaulBuildout_Handicap_Const_98.jpg (163460 bytes)    StPaulBuildout_Handicap_Const_99.jpg (146197 bytes)    StPaulBuildout_Handicap_Const_100.jpg (131682 bytes)    StPaulBuildout_Handicap_Const_101.jpg (156082 bytes)    StPaulBuildout_Handicap_Const_102.jpg (219479 bytes)

 

The following pictures show work status on 10/20/06.
These pictures show an insulated ceiling constructed in the back section of the buildout.
Another view showing the wall structure by the upper lift location is also shown.
Also, wall structures surrounding the location of the lower lift are shown.  Lastly, a view of the front section interior shows much of the ductwork wrapped with insulation.

StPaulBuildout_Handicap_Const_103.jpg (110427 bytes)    StPaulBuildout_Handicap_Const_104.jpg (129607 bytes)    StPaulBuildout_Handicap_Const_105.jpg (142132 bytes)     StPaulBuildout_Handicap_Const_106.jpg (137389 bytes)    StPaulBuildout_Handicap_Const_107.jpg (130195 bytes)

 

The following pictures show work status on 11/03/06.
Drywall and insulation are being installed!!

StPaulBuildout_Handicap_Const_108.jpg (126264 bytes)    StPaulBuildout_Handicap_Const_109.jpg (104244 bytes)    StPaulBuildout_Handicap_Const_110.jpg (126038 bytes)

StPaulBuildout_Handicap_Const_111.jpg (111360 bytes)    StPaulBuildout_Handicap_Const_112.jpg (53738 bytes)    StPaulBuildout_Handicap_Const_113.jpg (61323 bytes)

 

The following pictures show work status on 11/14/06.
The railings for the front entrance and for the handicap access ramp have been installed.
A newly installed copper drainpipe can also be seen in the first picture.   Additionally, the doors for the rear entrance and a casing for the corner support pillar in that area have been installed.  The inside views show additional drywall installed in the large front open area of the new entrance way.  Finally, the doors from the entrance way to the sanctuary have been hung, pending installation of hardware.

StPaulBuildout_Handicap_Const_114.jpg (182007 bytes)    StPaulBuildout_Handicap_Const_115.jpg (173021 bytes)    StPaulBuildout_Handicap_Const_116.jpg (163830 bytes)    StPaulBuildout_Handicap_Const_117.jpg (171019 bytes)

StPaulBuildout_Handicap_Const_118.jpg (108266 bytes)    StPaulBuildout_Handicap_Const_119.jpg (93253 bytes)    StPaulBuildout_Handicap_Const_120.jpg (113765 bytes)

 

The following pictures show work status on 12/15/06.
The first row of three pictures shows construction proceeding on the inside walls in the buildout's parking lot level and the church level.  New metal studs, as well as insulation can be observed.  Also "boxing" in of some of the heating system pipes can be observed in the third picture, which looks toward the church level front section of the buildout.  The second row of four pictures shows framing of the handicap access lifts with metal and wooden studs.  The first three pictures are of the lower lift showing the church level access, parking lot level access, and basement level access respectively.  The last picture shows the church level access of the upper lift that goes to the parish hall level.  Electric wiring can be observed in some of the pictures for the "call" buttons.

StPaulBuildout_Handicap_Const_121.jpg (147192 bytes)    StPaulBuildout_Handicap_Const_122.jpg (174156 bytes)    StPaulBuildout_Handicap_Const_125.jpg (139682 bytes)

StPaulBuildout_Handicap_Const_123.jpg (173369 bytes)    StPaulBuildout_Handicap_Const_126.jpg (166610 bytes)    StPaulBuildout_Handicap_Const_127.jpg (144052 bytes)    StPaulBuildout_Handicap_Const_124.jpg (134756 bytes)

 

The following pictures show work status on 12/21/06.
The project is really coming along!!  The first picture is a view looking down from the parish hall level to the upper front buildout level toward the doors to the sanctuary.   The second picture shows the almost completed drywall installation on the area above the opening to the front gathering area of the buildout.  The remaining pictures show various views of the handicap access lift areas with the lift mechanisms located in their proper places!!  Picture three shows the upper view of the lower lift.  Drywall installation can be observed on the church-facing wall of the buildout's parking lot level area.  Pictures four and five show lower views of the upper lift with the mechanism clearly visible.  Pictures six and seven show lower views of the lower lift also with a clear visible view of the lift mechanism .

StPaulBuildout_Handicap_Const_128.jpg (85207 bytes)    StPaulBuildout_Handicap_Const_129.jpg (98753 bytes)    StPaulBuildout_Handicap_Const_130.jpg (131125 bytes)    StPaulBuildout_Handicap_Const_131.jpg (83584 bytes)

StPaulBuildout_Handicap_Const_132.jpg (118307 bytes)    StPaulBuildout_Handicap_Const_133.jpg (107059 bytes)    StPaulBuildout_Handicap_Const_134.jpg (129176 bytes)

 

The following pictures show work status on 1/5/07.
The pictures show the finished drywall installation on the wall areas.
Coming later will be heating vent installation and dropped ceiling construction.

StPaulBuildout_Handicap_Const_135.jpg (85913 bytes)    StPaulBuildout_Handicap_Const_136.jpg (88349 bytes)    StPaulBuildout_Handicap_Const_137.jpg (96899 bytes)    StPaulBuildout_Handicap_Const_138.jpg (94526 bytes)

 

The following pictures show work status on 1/11/07.
The pictures show the installation of floor and wall tiles in the new bathroom areas.

StPaulBuildout_Handicap_Const_139.jpg (89601 bytes)    StPaulBuildout_Handicap_Const_140.jpg (82911 bytes)    StPaulBuildout_Handicap_Const_141.jpg (74008 bytes)    StPaulBuildout_Handicap_Const_142.jpg (82043 bytes)    StPaulBuildout_Handicap_Const_143.jpg (81096 bytes)

 

The following pictures show work status on 1/23/07 through 1/24/07.
The first four pictures show the dropped ceiling construction well on its way; the fifth
shows molding strips that have been varnished before installation; the next two pictures show the coat of paint that has been applied to the walls; the following two pictures show wainscot paneling that has been installed on one wall; the last picture shows baseboard installation work being done at the base of the original church wall.

StPaulBuildout_Handicap_Const_144.jpg (160195 bytes)    StPaulBuildout_Handicap_Const_145.jpg (82217 bytes)    StPaulBuildout_Handicap_Const_149.jpg (145929 bytes)    StPaulBuildout_Handicap_Const_151.jpg (120868 bytes)   StPaulBuildout_Handicap_Const_146.jpg (111206 bytes)

StPaulBuildout_Handicap_Const_147.jpg (90904 bytes)    StPaulBuildout_Handicap_Const_148.jpg (78071 bytes)    StPaulBuildout_Handicap_Const_150.jpg (125413 bytes)    StPaulBuildout_Handicap_Const_152.jpg (110825 bytes)    StPaulBuildout_Handicap_Const_153.jpg (139742 bytes)

 

The following pictures show work status on 2/21/07.
Pictures taken at various locations show some of the ceiling lighting in operation; one nearly completed bathroom can be observed, showing the fixtures and wall mounted steam heating; other pictures show a wall mounted steam heater near the entrance to the lower parking lot area and steam baseboard heating in this same area; a drinking fountain can be observed at the entrance to the bathroom area; a large sink and cabinet are shown in the meeting room area behind the upper front entrance area; the last picture shows the old front "breezeway" entrance doors removed and replaced with wall board which allows more usable area in the upper front entrance area.

StPaulBuildout_Handicap_Const_154.jpg (96085 bytes)    StPaulBuildout_Handicap_Const_155.jpg (79594 bytes)    StPaulBuildout_Handicap_Const_156.jpg (91565 bytes)    StPaulBuildout_Handicap_Const_157.jpg (89409 bytes)    StPaulBuildout_Handicap_Const_158.jpg (77152 bytes)

StPaulBuildout_Handicap_Const_159.jpg (80337 bytes)    StPaulBuildout_Handicap_Const_160.jpg (139105 bytes)    StPaulBuildout_Handicap_Const_161.jpg (104624 bytes)    StPaulBuildout_Handicap_Const_162.jpg (123658 bytes)    StPaulBuildout_Handicap_Const_163.jpg (120848 bytes)

StPaulBuildout_Handicap_Const_164.jpg (85225 bytes)    StPaulBuildout_Handicap_Const_165.jpg (86451 bytes)    StPaulBuildout_Handicap_Const_166.jpg (94844 bytes)

 

The following pictures show work status on 3/23/07.  Views of the almost completed handicap access lifts can be seen.  Also views of the installation of the new rugs in the front upper gathering area can be observed as well.  Views after installation of the rugs are also shown.   Additionally, a view is also included of the meeting room with a sink and cabinets.

StPaulBuildout_Handicap_Const_187.jpg (89067 bytes)    StPaulBuildout_Handicap_Const_188.jpg (78348 bytes)    StPaulBuildout_Handicap_Const_189.jpg (73597 bytes)    StPaulBuildout_Handicap_Const_190.jpg (190766 bytes)    StPaulBuildout_Handicap_Const_191.jpg (204617 bytes)

StPaulBuildout_Handicap_Const_192.jpg (114808 bytes)    StPaulBuildout_Handicap_Const_193.jpg (113306 bytes)    StPaulBuildout_Handicap_Const_194.jpg (132299 bytes)    StPaulBuildout_Handicap_Const_195.jpg (108713 bytes)    StPaulBuildout_Handicap_Const_196.jpg (91193 bytes)

StPaulBuildout_Handicap_Const_197.jpg (93999 bytes)    StPaulBuildout_Handicap_Const_198.jpg (177861 bytes)    StPaulBuildout_Handicap_Const_199.jpg (126177 bytes)     StPaulBuildout_Handicap_Const_200.jpg (120484 bytes)         StPaulBuildout_Handicap_Const_201.jpg (102879 bytes)

StPaulBuildout_Handicap_Const_202.jpg (160076 bytes)    StPaulBuildout_Handicap_Const_203.jpg (86425 bytes)     StPaulBuildout_Handicap_Const_204.jpg (79047 bytes)

 

The following pictures show work status on 4/2/07.  The project is almost done !!!  Various views of the handicap access upper and lower lifts (which are almost completed) are shown.  Also views of the almost completed interior showing the finished ceiling, walls, and floor are shown.   Additionally, a view of the doors from the sanctuary to the new area and exterior views of the new front entrance doors are shown as well.

StPaulBuildout_Handicap_Const_167.jpg (111519 bytes)    StPaulBuildout_Handicap_Const_168.jpg (85259 bytes)    StPaulBuildout_Handicap_Const_169.jpg (90928 bytes)    StPaulBuildout_Handicap_Const_170.jpg (91317 bytes)    StPaulBuildout_Handicap_Const_171.jpg (63231 bytes)

StPaulBuildout_Handicap_Const_172.jpg (151348 bytes)     StPaulBuildout_Handicap_Const_173.jpg (83900 bytes)    StPaulBuildout_Handicap_Const_174.jpg (164658 bytes)     StPaulBuildout_Handicap_Const_175.jpg (108308 bytes)    StPaulBuildout_Handicap_Const_176.jpg (166475 bytes)

StPaulBuildout_Handicap_Const_177.jpg (95588 bytes)    StPaulBuildout_Handicap_Const_178.jpg (109949 bytes)    StPaulBuildout_Handicap_Const_179.jpg (109949 bytes)    StPaulBuildout_Handicap_Const_180.jpg (107606 bytes)    StPaulBuildout_Handicap_Const_181.jpg (109562 bytes)

StPaulBuildout_Handicap_Const_182.jpg (115196 bytes)    StPaulBuildout_Handicap_Const_183.jpg (82109 bytes)    StPaulBuildout_Handicap_Const_184.jpg (99591 bytes)    StPaulBuildout_Handicap_Const_185.jpg (206305 bytes)    StPaulBuildout_Handicap_Const_186.jpg (178975 bytes)

 

The following pictures show work status on 5/29/07.  The project is essentially complete !!!  [A Ribbon Cutting, Prayer Service, and Reception celebrating the facility is scheduled for 6/2/07 at 3:00 p.m.  Special Congregational Dedication Services will be held on Sunday, 6/3/07 as part of our regular church services at 8:00 a.m. and 10:45 a.m.]   Various views of the handicap access upper and lower lifts (which are now complete!) are shown.  Also views of the completed interior, showing the various pieces of furniture in place, are shown.  Additional views are present showing the lower lift in operation and also use of the handicap access ramp at the front entrance.    Additionally, exterior views of the front and rear entrances are shown as well.  Also included is a video showing the lift in use.

StPaulBuildout_Handicap_Const_205.jpg (108852 bytes)    StPaulBuildout_Handicap_Const_206.jpg (112970 bytes)    StPaulBuildout_Handicap_Const_207.jpg (107291 bytes)    StPaulBuildout_Handicap_Const_208.jpg (152536 bytes)    StPaulBuildout_Handicap_Const_209.jpg (133256 bytes)

StPaulBuildout_Handicap_Const_210.jpg (148716 bytes)    StPaulBuildout_Handicap_Const_211.jpg (109415 bytes)    StPaulBuildout_Handicap_Const_212.jpg (127552 bytes)    StPaulBuildout_Handicap_Const_213.jpg (118488 bytes)     StPaulBuildout_Handicap_Const_214.jpg (97455 bytes)

StPaulBuildout_Handicap_Const_215.jpg (89106 bytes)    StPaulBuildout_Handicap_Const_216.jpg (102726 bytes)    StPaulBuildout_Handicap_Const_217.jpg (104485 bytes)    StPaulBuildout_Handicap_Const_218.jpg (107005 bytes)    StPaulBuildout_Handicap_Const_219.jpg (95846 bytes)

StPaulBuildout_Handicap_Const_220.jpg (164074 bytes)    StPaulBuildout_Handicap_Const_221.jpg (109419 bytes)     StPaulBuildout_Handicap_Const_222.jpg (110011 bytes)     StPaulBuildout_Handicap_Const_223.jpg (111046 bytes)    StPaulBuildout_Handicap_Const_224.jpg (115599 bytes)

StPaulBuildout_Handicap_Const_225.jpg (129621 bytes)    StPaulBuildout_Handicap_Const_226.jpg (112357 bytes)     StPaulBuildout_Handicap_Const_227.jpg (145448 bytes)    StPaulBuildout_Handicap_Const_228.jpg (147001 bytes)    StPaulBuildout_Handicap_Const_229.jpg (148837 bytes)

StPaulBuildout_Handicap_Const_230.jpg (142680 bytes)    StPaulBuildout_Handicap_Const_231.jpg (137375 bytes)    StPaulBuildout_Handicap_Const_232.jpg (195423 bytes)    StPaulBuildout_Handicap_Const_233.jpg (160597 bytes)    StPaulBuildout_Handicap_Const_234.jpg (165224 bytes)

StPaulBuildout_Handicap_Const_235.jpg (188091 bytes)    StPaulBuildout_Handicap_Const_236.jpg (152537 bytes)    StPaulBuildout_Handicap_Const_237.jpg (145598 bytes)    StPaulBuildout_Handicap_Const_238.jpg (166719 bytes)

Click on the icon below to view the video showing the lift in use.
[For those with slow connections (e.g. dial-up, etc.), right-click on the icon, select "Save Target as...", and then specify a location on your computer where to download the MOV video file.  It can then be played later at your convenience.]

EN00500A.gif (2038 bytes)

This web page was updated on 5/29/07.

WB01343_.gif (599 bytes)